March 24, 201214 yr Alloy swing arm finally fitted to 200pro, just a few mods I still want to do before the strip down to be powder coated, when it will also recieve a lot of polishing or anodizing.
March 25, 201214 yr How much work was need to get the pivot bolt to work , with the motor mount and new arm ?
March 25, 201214 yr It came from a Rev3 are you sure it came from rev3 as they have a mounting point on left side for the shock and they finish differnt towards the wheel end ,it looks more like a zero or techno one
March 25, 201214 yr Author Thats true it was bought off the bay as a rev3 but must be a techno one, the pivots at the engine end cam from a gas gas contact same size spindle so you can use, needle cage bearings, they were too wide and needed turn down a couple of mm
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.