October 4, 201213 yr I've got 7 concrete panels and don't know how to set them out to get the best out of my ability ...HELP...
October 5, 201213 yr Hi Otis, Are these sileage clamp sides? How long how wide? If there 3-4 ft wide but 8-10ft long you could..... Try an L shape with two at different heights giving you three heights including ground level? Try two together lengthways like a pyramid shape (you could lay one side of your L on top of one end), this would be a nice knife edge to get over? One could be made up as a steeper than 45 degree lengthways ramp up the back of an earth mound, on the opposite downward side stand one vertical but led horizontally as a low splatter wall to hop up onto the mound from ground level? The last you could lay horizontally but at 30-40 degrees as a killer side slope? Edited October 5, 201213 yr by pindie
October 5, 201213 yr Don't know the shape or size but try and get a small step (2' perhaps) and then a gap and another. You will then have to learn the technique of riding up the first step and carrying the front over the gap before balancing on top of the two pieces.
October 5, 201213 yr Author thanks for your advice pindie and steve i will have a mess about with them and find out what works
October 10, 201213 yr Post up some photos or sketches to show your plan. You'll have to come down and ride the seawall soon as well ?
October 11, 201213 yr Author Post up some photos or sketches to show your plan. You'll have to come down and ride the seawall soon as well ? Me and my dad have agreed to do it in the Christmas hols so will have some photos then and yeah ill try and come up in the Christmas hols if I can
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.