Jump to content

mazz46

Members
  • Posts

    49
  • Joined

  • Last visited

Posts posted by mazz46
 
 
  1. That's right lampkin imports them all and there is only 2 batches coming to the u.K the first 1 late Feb and batch 2 between 17 21 April your dealer will have had a update weeks a go???. If I was you I'd ring beta UK (John lampkin)

  2. Hi all while my bike is apart I was trying to tidy up the wiring as I don't run the lights etc. it's a 202 sy250

    just wanting to know what the boxes are and if I need them

    I assume the black box is the CDI need that!

    The round one attached to the sub frame a capacitor do I still need it to run the fan?

    What does the silver box do? Do I need it?

 
×
  • Create New...